Back in April, the Tereshchenko Group of Companies carried out the partial demolition of the Retroville Mall building. Part of it had been destroyed by a missile from the occupying country. More details.
After the demolition works, a large amount of construction waste remained:
– concrete,
– reinforced concrete,
– metal
– Other.
In wartime conditions, saving materials and reusing them plays a particularly important role. It was for this reason that the specialists of the Tereshchenko Group of Companies were called in.
Our team was set the following tasks:
1. Processing concrete into crushed concrete stone;
2. Processing reinforced concrete into crushed concrete stone with separation of rebar and other elements;
3. Sorting of the processed waste.
Carrying out the works takes place in especially hazardous conditions and requires not only the professionalism of the excavator operators, but also the newest and most modern equipment. This allows all work to be carried out not only without delays, but also with maximum safety for everyone involved.