A factory is a type of industrial facility characterized by large-scale production. Such industrial complexes consist of one or several buildings located near each other: workshops, warehouses, office buildings, and other specialized structures.
Partial or full dismantling of a factory may be required for a number of reasons, including:
– Restoration of part of the factory;
– Complete demolition of the factory to build a new one;
– Demolition of old buildings to construct modern facilities;
– Removal of obsolete structures to make way for new construction;
– Elimination of unnecessary buildings due to restructuring or changes in production focus;
– And more.
Depending on the reasons for dismantling and the specific features of the facility, an individual approach is required for each site.
The Tereshchenko Group’s specialists have repeatedly dealt with the above-mentioned tasks and have the experience to perform them effectively. For over 20 years, we have been handling the most complex projects and are always ready to complete the work efficiently. Our experience, professionalism, modern fleet of specialized equipment, and tailored approach ensure the timely completion of any task.
The process of dismantling factory buildings is complex and typically includes several additional steps that can be divided as follows:
– Site analysis and assessment;
– Selection of the most effective dismantling method;
– Preparation of required permits for the project;
– Preparing the site for equipment and work initiation;
– Demolition of the factory or specific building using the chosen method;
– Construction waste recycling for future use (upon request);
– Site cleaning and debris removal;
– Preparing the site for future construction (if necessary);
– Excavation for new construction (if necessary).
It is always more convenient for clients to work with a single contractor—and demolition is no exception. Unfortunately, few companies have their own full fleet of equipment to carry out all the above-listed tasks, which often leads to complications. The Tereshchenko Group is one of the few companies in Ukraine that not only owns all necessary equipment but also operates modern machinery capable of efficient work without delays due to repairs:
– JCB 220 tracked excavators;
– Volvo EC 220DL tracked excavators;
– Excavator attachments: Rent Demolition RD15 hydraulic shears;
– Excavator attachments: Soosan SB70 hydraulic breaker;
– Volvo FM400 4-axle dump trucks with 30-ton capacity;
– Scania P400 4-axle dump trucks with 30-ton capacity;
– McCloskey J40 jaw crusher.
By choosing the Tereshchenko Group, you can be confident in the high-quality execution of all work, supported by the following factors:
– No intermediaries involved;
– Large fleet of modern specialized equipment;
– Best-in-class tools and machinery;
– Highly qualified personnel with years of experience;
– Recycling of construction waste for reuse or sale, helping you save significantly;
– All work is performed in accordance with current regulations and legal requirements;
– Guaranteed on-time or early project completion.
A factory comprises a complex network of infrastructure and communications. Therefore, the cost of factory demolition depends on various factors:
– Scope of dismantling;
– Complexity of the facility;
– Location of the factory;
– Full or partial demolition requirements;
– Legal and regulatory requirements;
– And other site-specific considerations.
For accurate information and consultation, contact us using any convenient method or leave your phone number in the callback form. Our experts will be happy to assist you.

