So-called selective or partial demolition — dismantling with preservation of key structural elements — is carried out across Ukraine for a number of reasons, including:

  • The need for reconstruction of the facility;
  • A planned change in the operational profile of the building;
  • The requirement to improve production efficiency (for industrial facilities).

Partial demolition is most characteristic of facilities with a developed infrastructure and an extensive network of engineering utilities. This category typically includes large industrial and commercial objects with clearly distinct heterogeneous components — plants, industrial complexes, hangars, and water towers whose upper sections are usually assembled from metal.

Scope of Partial Demolition Works

Partial demolition is also applicable to residential buildings requiring roof replacement or internal renovation. In such cases, the priority is to efficiently resolve the organisational issues related to the temporary relocation of residents. Partial demolition of residential buildings frequently involves the dismantling of internal partitions, window and door frames, and sanitary and plumbing systems.

Partial demolition is typically commissioned in the following situations:

  • Office or apartment renovation works;
  • Severely worn roofing or internal structural elements;
  • A section of the building has been deemed structurally unsound and requires major repair;
  • Urgent remediation of the consequences of an accident or emergency.

Equipment for Partial Demolition

Key equipment used in partial building demolition includes:

  • High-reach cranes (rail-mounted dismantling cranes or mobile cranes);
  • Specialist machinery with demolition attachments of sufficient reach;
  • Loaders for loading and removing demolished structural elements;
  • Dump trucks for transporting roofing or partition remnants to recycling facilities.

Hand tools — angle grinders, jackhammers, and similar equipment — are also used in partial dismantling. All such work requires experienced specialists and qualified machinery operators.

Before selecting the demolition method, the construction materials used in the original structure must be assessed. This information, available from the relevant project documentation, enables more effective and precise dismantling of the required section of the building.