Demolition and Site Preparation for Astarta Agro Protein Plant

Location: Hlobyne, Poltava region, Ukraine
Client: Astarta Agro Protein LLC
Dates: April–May 2024
Scope: site preparation for the construction of a new plant.

We carried out a large-scale package of demolition works to clear the site for a new plant for Astarta Agro Protein LLC. The job called for specialist machinery, including a jaw crusher, excavators fitted with hydraulic breakers and shears, and heavy tipper trucks. Thanks to a well-coordinated team and high-performance equipment, every stage of the demolition was completed safely and to a high standard.

Scope of works:

  1. Demolition of production buildings

The project included the complete demolition of the production buildings, covering both external and internal structures, which required highly skilled operatives and specialist machinery.

  1. Foundation demolition

The foundations were broken out by heavy excavators fitted with hydraulic breakers, allowing the concrete bases of the buildings to be removed quickly and efficiently and the site to be made ready for new construction.

  1. Bomb shelter demolition

One of the most demanding stages was the demolition of a bomb shelter with a reinforced structure. The work was carried out in full compliance with safety requirements to prevent accidents and protect the environment.

  1. Basement demolition

Basement demolition called for particular care and precision. Our engineers carried out a detailed structural assessment before work began, which prevented any uncontrolled movement or damage to adjacent structures.

  1. Dismantling of steel grain silos and dryers – 700 t of steel

Steel grain silos and dryers with a total weight of 700 tonnes were dismantled. This required specialist equipment, in particular hydraulic shears, to cut down the large steel members efficiently.

  1. Dismantling of steel structures

A range of steel structures was dismantled, including building frames and other steel elements, using high-performance hydraulic shears.

  1. Concrete and brick recycling – 14,000 m³

All demolished concrete and brickwork was crushed on site with a McCloskey J40 jaw crusher. In total, 14,000 m³ of material was recycled into aggregate for subsequent construction works.

LOOKING FOR A RELIABLE SPECIALIST FOR YOUR NEXT PROJECT?

Machinery on site:

Crushers:
— Jaw crusher McCloskey J40

Excavators:
— Excavator HYUNDAI R330LC-9S
— Excavator Volvo EC 220 DL

Attachments:
Hydraulic breaker SOOSAN SB121
Hydraulic shears NPK S-22XA
Hydraulic shears KOBENOR MASKIN, MYUNGSAN SAMSON-1000

Tipper trucks:
— Four-axle tipper truck SCANIA P400 8X4
— Four-axle tipper truck VOLVO FM400 8X4

HOW TO ORDER A SERVICE?

The TERESHCHENKO Group of Companies strives to do everything possible to make communication with our clients as convenient as possible. You can reach us in whichever way works best for you:

  • Calls only: +380 50 353 11 88
  • Viber, Telegram, WhatsApp: +380 66 215 42 48
  • In English: Liliia, +380 95 470 99 98 (Viber, Telegram, WhatsApp)
  • Email us at: 1725577@gmail.com
  • Or fill out the contact form and we’ll get back to you!

LOOKING FOR A RELIABLE SPECIALIST FOR YOUR NEXT PROJECT?

near_meOur Address

Ukraine, Zhytomyr,
81 Pokrovska St.

mailAlways Online

1725577@gmail.com
demontazh-group.com

phoneAlways in Touch

Calls: +380 50 353 11 88
Viber · Telegram · WhatsApp: +380 66 215 42 48

watchWorking Hours

Mon.–Fri.: 9:00 – 18:00
Sat.: 11:00 – 17:00
Sun.: By appointment