We were approached by a regular client to carry out complex partial demolition works while retaining the main structural elements of the buildings. The aim of the project was to restore the structures and build a new plant on the basis of the existing infrastructure.
This is one of the projects where we applied an integrated approach: the works involved not only large heavy machinery, but also mini excavators – for demolition inside the buildings and on the roof. This approach allowed us to streamline the process, improve precision and safety, and significantly shorten the timeline of the project.
Partial demolition of production buildings – 4,300 m²
The first stage involved partial demolition of a 4,300 m² production area.
The works included:
- demolition of external walls;
- demolition of internal walls;
- dismantling of the ventilation system, which was outdated and no longer fit for use;
- breaking out of reinforced concrete floors, including the sub-base.
Result:
The production building was made ready for reconstruction. All that was left was the structural frame of the building – the retained columns, crossbeams and beams that will form the basis of the new project. This approach saves the client’s resources and shortens the construction programme for the new facility.
Partial demolition of a three-storey office building – 3,200 m²
The second stage was the partial demolition of an administrative (office) building with a floor area of 3,200 m² over three storeys.
Demolition works carried out:
- full removal of internal partitions and walls;
- complete removal of floor finishes on all floors;
- removal of floor screeds – both the top layer and the lower base layers;
-
removal of the asphalt and roofing felt covering from the roof, which needed complete replacement.
Result:
Only the reinforced concrete frame and external walls of the building were retained. This approach not only preserves the building structure but also significantly speeds up reconstruction, avoiding the cost of building new structural elements.
An integrated approach to demolition
All works were carried out in accordance with the approved demolition plan and with due regard to the future use of the facility. Key objectives:
- retain the structural elements of the buildings in a technically sound condition;
- prepare the site for reconstruction without harm to the environment or existing infrastructure;
- ensure safety on site throughout the works.
TERESHCHENKO Group specialises in partial demolition ahead of reconstruction. We have extensive experience in demolishing industrial, administrative, commercial and infrastructure facilities.
Why clients choose us:
- full technical support from design to site handover;
- our own fleet of machinery;
- a flexible approach to projects of any complexity;
- compliance with health, safety and environmental regulations.
Need production or office buildings stripped back for reconstruction?
We know how to do it to a high standard, safely and on a tight schedule.
Contact our specialists or submit a request on our website, and we will price the demolition for your site.