After the dismantling of warehouse premises, the next task was to process and sort the construction waste.
The Tereshchenko Group of Companies operates its own equipment from top global brands, allowing for more efficient and faster completion of all work stages.
Additional challenges during recycling were due to the wide variety of material types, their hardness, and dimensions:
– concrete debris;
– reinforced concrete waste;
– stone;
– metal structures;
– composite materials (reinforced concrete combined with stone, wood, and other elements).
The total volume of recycled waste amounted to 18,000 m³.
All work was completed within the scheduled timeframe, despite additional requirements and difficulties encountered during the process.