TERESHCHENKO Group of Companies successfully implemented another large-scale project in the Khmelnytskyi region — the dismantling of reinforced concrete silos 28 meters high.
Comprehensive Dismantling Works
The dismantling of the silos was carried out in two stages. This work format was necessary due to parallel production processes and the uninterrupted operation of the enterprise. The team worked taking into account all the features of the operating facility, strictly observing safety requirements and the agreed schedule.
The works included:
- inspection of structures and preparation of the site;
- staged dismantling of 28-meter-high reinforced concrete silos;
- breaking of concrete and cutting of reinforcement;
- sorting and loading of material;
- removal of construction waste.
Project Highlights
The main challenge of the project was carrying out the dismantling at an operating enterprise without stopping its work. This required staged execution of the works, precise planning of the dismantling sequence, and constant safety monitoring on site. Working at a height of 28 meters with massive reinforced concrete structures required well-coordinated interaction of the equipment operators and the use of machinery with an extended boom.
Thanks to a professional approach and the team’s experience, the project was completed safely, in an organized manner, and within the established deadlines.
Professional Demolition by TERESHCHENKO Group of Companies
TERESHCHENKO Group of Companies performs demolition and dismantling works of any complexity throughout Ukraine, ensuring:
- a comprehensive approach to demolition;
- modern specialized equipment;
- compliance with safety standards;
- prompt completion of works;
- recycling and reuse of materials.
If you need professional dismantling of silos, industrial structures, or reinforced concrete constructions, including at operating facilities — contact TERESHCHENKO Group of Companies.