To construct a new production facility, it was necessary to dismantle the pig farm. These were multifunctional structures built from various materials.
Tasks assigned to Tereshchenko Group:
— dismantling of buildings;
— processing of construction waste;
— sorting of construction waste for reuse.
After dismantling all structures, Tereshchenko Group specialists sorted the construction waste for further recycling.
The recycled materials were then used to reinforce and backfill roads, as well as for other customer needs.
Total scope of dismantling work performed:
• Demolition of above-ground structures – 26,250 m³
• Processing of construction materials – 5,250 m³