To prepare the site for the construction of a new industrial facility, it was necessary to dismantle the existing pig farm. These were multifunctional structures built from various types of materials.
Tasks assigned to the Tereshchenko Group:
— dismantling of buildings;
— recycling of construction waste;
— sorting construction waste for reuse.
After dismantling all structures, specialists from the Tereshchenko Group sorted the construction waste for further processing.
The recycled materials were later used for road reinforcement and backfilling, as well as to meet other customer needs.
Total dismantling work completed:
• Dismantling of above-ground buildings – 26,250 m³
• Processing of construction materials – 5,250 m³