Address: Ukraine, Kyiv, Pushcha-Vodytsia
General contractor:
Dates: September 2017 – to present
Tasks: demolition of structures, excavation, reinforced concrete recycling

The demolition of an old pioneer camp was carried out with selective processing and disposal of construction waste. Wooden structures, reinforced concrete buildings, and building foundations were demolished within the deadlines specified by the customer.

The use of recycling technologies makes it possible to reuse the remains of reinforced concrete structures, which, after being processed into recycled crushed stone, were used to form the road sub-base across the entire construction site.