Given the rapid rise in the cost of construction materials, partial demolition of factories and plants is becoming increasingly popular. This approach helps significantly reduce the costs and speed of restoration works, as we have written about many times.
In turn, such works are much more complex for the company carrying out the partial demolition. It is necessary to rely not only on the technical specifications and structural features, but also on one’s own experience.
You can judge the complexity of the works from the photos published below. It is precisely because of the complexity of such projects that clients most often turn to the Tereshchenko Group of Companies.
More about the tasks set before us:
1. Preparation for the demolition works, fixing of undamaged structures and other works;
2. Demolition of equipment and its transportation;
3. Demolition of the metal structures of the production premises;
4. Demolition and partial demolition of reinforced concrete structures;
5. Sorting of scrap metal after demolition;
6. Loading and removal of construction waste.
The following were used for the works:
Excavators:
– Excavator HYUNDAI R330LC-9S
– Excavator Volvo EC 220 DL
Attachments:
– Hydraulic hammer SOOSAN SB121
– Hydraulic shears NPK S-22XA
– Hydraulic shears Rent Demolition RD15
Dump trucks:
Four-axle dump truck SCANIA P400 8X4
Four-axle dump truck VOLVO FM400 8X4