Demolition of a Bridge in Irpin

Address: Ukraine, Irpin, Kyiv region
General contractor:
Dates: 05.09.2023 – 15.09.2023
Tasks: demolition of the bridge and removal of construction waste.

The task for the Tereshchenko Group of Companies was to carry out the demolition of the bridge. To achieve this goal, we used specialized equipment and strictly adhered to all necessary safety measures while performing the works.

After the demolition process was completed, a significant amount of construction waste was generated.

Our tasks were as follows:

Bridge demolition: dismantling of the bridge structure while maintaining safety.

Disposal of construction waste: collection, transportation and processing.

The works were carried out under conditions of particular risk, which required a high level of professionalism from the excavator operators, as well as the use of advanced technologies. This ensured the reliability and safety of completing all tasks without delays and guaranteed the maximum level of safety for everyone involved in the process.

LOOKING FOR A RELIABLE SPECIALIST FOR YOUR NEXT PROJECT?

The following was used for the bridge demolition:

Excavators:
– Excavator Volvo EC 220 DL
Dump trucks:
Four-axle dump truck VOLVO FM400 8X4