Tereshchenko Group of Companies carries out construction waste removal across Ukraine — after demolition works, reconstruction, or new construction. Our own fleet of 8-axle dump trucks with 18–20 m³ capacity and experience on complex industrial sites guarantees timely and thorough site clearance.
local_shippingConstruction Waste Removal Turnkey
Why Clients Choose Us for Waste Removal
NEED CONSTRUCTION WASTE REMOVED?
What We Remove
Our Equipment for Waste Removal
| Dump trucks for construction waste removal: | |
| Volvo FM 400 8X4 — body volume 18 m³ | ![]() |
| Scania P400 8X4 — body volume 20 m³ | |
Frequently Asked Questions
The cost depends on the volume of waste, type of materials, distance to the landfill, and loading conditions. Usually calculated per trip or per m³. After inspecting the site, we provide an exact price.
Dump trucks are typically dispatched within 1–2 business days after agreement. For large volumes — we create a detailed schedule to match your deadlines.
Construction waste is transported to licensed landfills. We handle all required documentation, including waste passports when needed.
Yes, and this is the most convenient option. We handle the full cycle: structure demolition → on-site concrete recycling → removal of remaining materials and metal. One contractor — one responsibility.
How to Order Construction Waste Removal
Tereshchenko Group of Companies strives to make communication with our clients as convenient as possible. You can reach us in any way that suits you:
- Call us: 0503531188
- Write or call via Viber: 0662154248
- Email us: 1725577@gmail.com
- Or fill out the feedback form and we will contact you!


