Demolition of Retroville

Address: Ukraine, Kyiv, 47 Pravdy Avenue
General Contractor:
Dates: April 2022
Scope of Work: complex demolition of the 12-storey section of the Retroville shopping mall.

Sadly, the war in our country has damaged a great many buildings of every kind.
Despite the danger, the TERESHCHENKO Group of Companies began carrying out demolition work and contributing to the restoration of Ukraine’s buildings.
The first site was the Retroville shopping mall, which had opened only on 30 May 2020. Unfortunately, as a result of a direct missile strike and the fire that followed, it was severely damaged and partially destroyed. Yet with the right approach from construction-industry experts, the opportunity to restore it emerged.
The first stage was an inspection of the destruction by city services, the police, the State Emergency Service (SES), sappers, and other representatives of the authorities and specialized services.
The second stage, following calculations and special operations, was the partial demolition of the damaged elements of the reinforced concrete structures.
As you know, the experienced specialists of the TERESHCHENKO Group of Companies have vast experience in carrying out complex partial-demolition work on buildings. This makes it possible to save considerable money and time on the restoration or redevelopment of buildings and structures. The work at the Retroville shopping mall became yet another test of the professionalism of all our specialists.
Our team was assigned the following tasks:
1. Demolition of part of the reinforced concrete floor slabs between the first and second storeys of the twelve-storey building;
2. Preservation of all undamaged elements of the building;
3. Clearing of the site;
The work is carried out under especially hazardous conditions and demands not only the professionalism of the excavator operators but also the very latest, most modern machinery. This makes it possible to perform all the work not only without delays but also with maximum safety for everyone involved.

LOOKING FOR A RELIABLE SPECIALIST FOR YOUR NEXT PROJECT?

The following were deployed for the partial demolition of the Retroville shopping mall:
Excavators:
HYUNDAI R330LC-9S excavator (a new, high-performance, increased-power excavator)
Volvo EC 220 DL excavator
Attachments:
NPK S-22XA hydraulic shears
Rent Demolition RD15 hydraulic shears
Dump Trucks:
Four-axle SCANIA P400 8X4 dump truck
Four-axle VOLVO FM400 8X4 dump truck

HOW TO ORDER A SERVICE?

The TERESHCHENKO Group of Companies strives to do everything possible to make communication with our clients as convenient as possible. You can reach us in whichever way works best for you:

  • Call us at: 0503531188
  • Message or call us on Viber: 0662154248
  • Email us at: 1725577@gmail.com
  • Or fill out the contact form and we’ll get back to you!

LOOKING FOR A RELIABLE SPECIALIST FOR YOUR NEXT PROJECT?

near_meOur Address

Ukraine, Kyiv,
56 Antonovycha St.,
APK EV Bldg., Office 404

mailAlways Online

1725577@gmail.com
demontazh-group.com

phoneAlways in Touch

Phone: +380503531188
Viber: +380662154248

watchWorking Hours

Mon.–Fri.: 9:00 – 18:00
Sat.: 11:00 – 17:00
Sun.: By appointment