



TERESHCHENKO Group delivered a large-scale project in the Zakarpattia region comprising over 20,000 m³ of earthworks and the recycling of 7,000 t of construction materials. The works were delivered as a complete package: from demolition and crushing of construction materials to site grading and infrastructure works.
Why recycling matters for the region
Recycling construction waste is now one of the key drivers of environmentally sound construction. Using secondary materials makes it possible to:
- reduce the burden on landfills and cut the volume of waste disposed of;
- conserve natural resources, replacing virgin aggregate with recycled aggregate;
- lower costs for clients by reusing materials;
- improve the quality of infrastructure, as modern crushing technology produces a uniform, high-strength material.
On this project we recycled concrete, precast reinforced concrete elements and brick. The recycled aggregate was used to build a parking area and stabilise the site base.
Earthworks
The earthworks exceeded 20,000 m³ and included:
- grading and levelling of the ground;
- cut-and-fill and compaction of soil;
- surfacing the site with recycled aggregate.
As a result, a fully prepared site was delivered, ready for commercial and industrial use.
Result
By combining modern recycling technology with powerful heavy machinery, TERESHCHENKO Group completed the works quickly, to a high standard and in full compliance with environmental standards. The Zakarpattia project confirms that an integrated approach is the most effective way to handle waste recycling and site development of any complexity.


