TERESHCHENKO Group continues to demolish buildings damaged by the hostilities. To make way for new buildings and infrastructure, the destroyed hangars had to be taken down and the construction waste recycled for reuse.
Works carried out by our team:
• demolition of hangars;
• foundation demolition;
• demolition of reinforced concrete structures and columns;
• brick recycling;
• reinforced concrete recycling;
• concrete recycling;
• construction waste removal.
The total volume of the demolished buildings was 16,200 m³.