Tereshchenko Group performs demolition of factories and industrial plants of any type: textile, food, chemical, confectionery, furniture and other manufacturing facilities. We handle complete demolition of closed sites and partial dismantling of individual buildings on operating enterprises — from a single workshop to a full industrial complex with concrete recycling and scrap metal removal.
precision_manufacturingFactory & Plant Demolition Turnkey
Why clients choose us for factory demolition
NEED FACTORY OR PLANT DEMOLITION?
Our equipment for factory and plant demolition
| Tracked excavators with demolition equipment: | |
| – VOLVO EC 220 DL | ![]() |
| – JCB 220 | |
| – HYUNDAI R330LC-9S — for massive RC structures of plants | |
| Dump trucks for construction waste and scrap metal removal: | |
| – Volvo FM 400 8X4, Scania P400 8X4 | ![]() |
Frequently asked questions
Full cycle: development of the work organization plan, dismantling of technological systems, mechanical demolition of buildings, separation and delivery of metal, on-site RC crushing, waste removal, site cleanup.
Partial demolition is the demolition of individual buildings or sections without completely shutting down the enterprise. Applied when individual buildings have exhausted their service life or become emergency structures, while operating areas continue to work.
Yes. Partial demolition of individual buildings is carried out without stopping operating production areas. A clear work organization plan is developed, the schedule is agreed upon, and safety measures are enhanced.
Load-bearing trusses, crane girders, and other metal structures are separated, cut, and delivered as scrap metal. This partially offsets the cost of demolition for the client.
The cost depends on: total volume, floor area and number of storeys, structural material, share of metal (partially compensated), presence of foundations, operating mode (active production or closed facility), possibility of RC recycling, and region. Exact price after an engineer’s site visit.
A single workshop takes from a few days to 2–3 weeks; a large industrial complex can take from several months to six months or more. The exact schedule is determined by an engineer before work begins.
How to order factory demolition?
Tereshchenko Group of Companies does everything possible to ensure maximum convenience for our clients. You can reach us in any way that suits you:
- Call us: 0503531188
- Write or call on Viber: 0662154248
- Send an email: 1725577@gmail.com
- Or fill out the feedback form and we will contact you!



