The Tereshchenko Group of Companies was tasked with crushing concrete and reinforced concrete. To achieve this goal, we used specialized equipment. We adhered to all necessary safety measures throughout this process.
After the demolition works, a large amount of construction waste remained:
– concrete,
– reinforced concrete.
Our team was set the following tasks:
1. Processing concrete into crushed concrete stone;
2. Processing reinforced concrete into crushed concrete stone with separation of rebar and other elements;
3. Sorting of the processed waste.
Carrying out the works takes place under conditions of particular risk, and this requires not only a high level of professionalism from excavator operators, but also the use of the newest and most advanced technologies. This makes it possible to ensure that all works are carried out without any delays and guarantees maximum safety for everyone involved in the process.