Address: Ukraine, Kyiv region, Borodyanka, Tsentralna St.
General contractor: Teravtobud LLC
Dates: December 2022
Tasks: Comprehensive demolition of 7 structures of varying complexity, removal of construction waste.

Borodyanka is one of the most severely destroyed towns in the Kyiv region. Specialists of the Tereshchenko Group of Companies joined the town’s recovery effort. We faced a challenging task: demolishing seven objects in the shortest possible time. These were buildings ranging from 1 to 9 storeys, located among other structures in the central part of the town.

Work performed on all 7 objects was carried out in parallel, involving a large fleet of specialized equipment, machinery and specialists.

TOTAL VOLUME OF WORK PERFORMED:
* demolition of buildings – 38,589.47 m³
* dismantling of foundations (reinforced concrete, concrete, stone) – 1,571.82 m³
* demolition of basements – 889.20 m³
* loading and removal of construction waste – 19,040.24 tons

More about each object:

1. Demolition of a 5-storey residential apartment building
Address:
324 Tsentralna St., Borodyanka, Bucha district, Kyiv region
Works performed:
* dismantling of reinforced concrete foundations – 248.3 m3;
* demolition of the building – 8,023 m3 (walls – 7,347 m3, roof – 676 m3);
* demolition of the basement – 889.2 m3;
* loading and removal of construction waste – 4,469 tons

2. Two-storey administrative premises of the Prosecutor’s Office
Address: 230 Tsentralna St., Borodyanka, Bucha district, Kyiv region
Works performed:
* dismantling of rubble-stone foundations – 452.5 m3;
* demolition of the building – 4,156 m3 (walls – 3,910 m3, roof – 246 m3);
* loading and removal of construction waste – 2,798 tons

3. Demolition of an emergency-hazardous facility, a two-storey residential apartment building
Address:
340 Tsentralna St., Borodyanka, Bucha district, Kyiv region
Works performed:
* dismantling of rubble-stone foundations – 92 m3;
* demolition of the building – 3,469.21 m3 (including the roof);
* loading and removal of construction waste – 1,678.34 tons

4. Demolition of an emergency-hazardous facility, an administrative agricultural premises.
Address: 327 Tsentralna St., Borodyanka, Bucha district, Kyiv region
Works performed:
* dismantling of stone-rubble foundations – 117 m2;
* demolition of the building – 223.71 m3 (including the roof);
* loading and removal of construction waste – 4,469 tons

5. Demolition of the Borodyanka Center for Social and Psychological Rehabilitation of the Population “Dovirya”
Address: 228 Tsentralna St., Borodyanka, Bucha district, Kyiv region
Works performed:
* dismantling of stone-rubble foundations – 121.72 m2;
* loading and removal of construction waste – 564.3 tons

6. Demolition of the military commissariat
Address: 294 Tsentralna St., Borodyanka, Bucha district, Kyiv region
Works performed:
* dismantling of reinforced concrete foundations – 74.4 m3;
* demolition of the building – 314.55 m3 (including the roof);
* loading and removal of construction waste – 627 tons

7. Demolition of a 9-storey residential apartment building
Address: 359 Tsentralna St., Borodyanka, Bucha district, Kyiv region
Works performed:
* dismantling of reinforced concrete foundations – 465.9 m3;
* total building volume of the above-ground part – 22,403 m3;
* loading and removal of construction waste – 8,402 tons

Demolition was carried out jointly with colleagues, involving specialized equipment – a “demolition” excavator with an extended boom.

Equipment used for the works:

Excavators:
– Excavator HYUNDAI R330LC-9S
– Excavators Volvo EC 220 DL

Attachments:
Hydraulic shears NPK S-22XA
Hydraulic shears Rent Demolition RD15

Dump trucks:
Four-axle dump truck SCANIA P400 8X4
Four-axle dump truck VOLVO FM400 8X4