Vertical planning of earthworks

Vertical Site Grading is a set of geodetic tasks aimed at modifying and transforming the landscape’s relief.

Stages of Vertical Planning:
Preparation Stage: Our specialists study the complete project documentation and estimate the scope of work. During this phase, we determine the methodology, types, and quantity of special machinery and equipment needed to carry out the tasks;
Field Survey: A crew is dispatched to the site to conduct topographic surveys. The collected data is processed into a technical report and sent to the design department, where an analysis and execution conclusion is prepared;
Contract Agreement: Based on the results of the preparatory and field stages, a contract is signed;
Machinery Deployment and Execution: The final stage involves equipment allocation and the actual implementation of vertical site grading works.

Why is Vertical Grading Important?
Typically, vertical site grading is a preliminary step before:
– Installation of infrastructure elements and building construction;
– Landscape design works;
– Site beautification;
– Urban or suburban development;
– Park development;
– Embankment construction;
– Landscaping of water-adjacent zones;
– Road construction;
– Laying underground utilities.

Vertical Grading Costs
As with any other type or phase of construction work, the cost of vertical grading depends on various factors, including:
– Terrain complexity;
– Site area;
– Selected grading methodology;
– Type and amount of equipment involved;
– Project deadlines;
– Distance from city infrastructure;
– Presence of obstacles that complicate execution;
– Soil volume.

The Importance of Working with Professionals
Vertical grading has always played a key role in the construction of any structure. It’s not only surveyors conducting calculations who are important, but also excavator and bulldozer operators. Proper execution affects future usability, connectivity, structure, and safety of the developed site.

The Tereshchenko Group of Companies has specialized in vertical site grading of any complexity for many years. With our own fleet of modern machinery from top global brands and a team of highly qualified professionals, we guarantee fast and high-quality work.

By choosing the Tereshchenko Group, you ensure:
– No intermediaries;
– Access to a fleet of modern heavy machinery;
– Use of the best equipment available;
– Skilled staff with years of experience;
– Construction waste recycling for reuse or sale, saving you money;
– Compliance with all regulatory and legal requirements;
– Timely or early project completion.

For accurate information or consultation, contact us in any convenient way or leave your number in the callback form. Our experts are always ready to provide professional assistance.

HOW TO ORDER FACTORY DEMOLITION | PARTIAL DEMOLITION?

The Tereshchenko Group ensures the most convenient communication methods for our clients. You can reach us in any way that suits you:

LOOKING FOR A RELIABLE EXPERT FOR YOUR NEXT PROJECT?

near_meOur Address

Ukraine, Kyiv, Antonovycha St. 56, APK EV building, Office 404

mailAlways Online

1725577@gmail.com demontazh-group.com

phoneAlways in Touch

Phone: +380503531188 Viber: +380662154248

watchWorking Hours

Mon–Fri: 9:00 – 18:00 Sat: 11:00 – 17:00 Sun: By appointment